US-12 over WHETSTONE CREEK

5M E CHECKERBOARD · County 059, Montana · Built 2012 · 2 Lanes · 347 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P00014067+09901
Year Built
2012
Length
39.1 m (128.3 ft)
Max Span
38.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
347
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.