US 287 over JEFFERSON RIVER

10M SW THREE FORKS · County 043, Montana · Built 2001 · 2 Lanes · 1,227 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P00013083+00441
Year Built
2001
Length
105.9 m (347.4 ft)
Max Span
33.6 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
1,227
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.