SECOND ST S-US 89 over YELLOWSTONE RIVER

GARDINER-SECOND ST S · County 067, Montana · Built 1930 · 2 Lanes · 4,964 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P00011000+01651
Year Built
1930
Reconstructed
1975
Length
124.6 m (408.8 ft)
Max Span
58.5 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,964
Material
Steel Continuous
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.