US 93 over MCCALLA CREEK

5M N VICTOR · County 081, Montana · Built 2010 · 4 Lanes · 10,026 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P00007065+00651
Year Built
2010
Length
20.4 m (66.9 ft)
Max Span
20 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
10,026
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$70,000
Total Project Cost
$105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.