S 200 over THOMPSON RIVER

5M SE THOMPSON FALLS · County 089, Montana · Built 2015 · 2 Lanes · 2,177 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
P00006056+02351
Year Built
2015
Length
133.7 m (438.6 ft)
Max Span
50.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,177
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$979,000
Total Project Cost
$1,469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.