IRR - US 93 over RR-FINLEY CREEK

14M N MISSOULA · County 063, Montana · Built 2009 · 2 Lanes · 9,214 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P00005009+06741
Year Built
2009
Length
104.9 m (344.2 ft)
Max Span
34.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
9,214
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$330,000
Total Project Cost
$495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.