US 12 over TIMBER CREEK

5M W BAKER · County 025, Montana · Built 1998 · 2 Lanes · 825 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P00002077+04151
Year Built
1998
Length
24.1 m (79.1 ft)
Max Span
9.1 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
825
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.