IRR - US 2 over BEAR CREEK
4M SW SUMMIT · County 029, Montana · Built 1966 · 2 Lanes · 2,025 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.268514, -113.440861
This bridge is in worse condition than 71.6% of bridges in County 029. The average bridge in Montana is 0 years old; this one is 60 years old.
Nearby Bridges
GIEFER CREEK RD over GEIFER CREEK 095
Built 1976
IRR - US 2 over DEVIL CREEK
Built 1963
FOREST ROAD over SKYLAND CREEK
Built 1963
IRR - US 2 over BEAR CREEK
Built 1966
IRR - US 2 over SNOWSLIDE GULCH
Built 1981
IRR-US 2 over UNSTABLE SLOPE
Built 1981
IRR - US 2 over GOAT UNDERPASS
Built 1981
IRR - US 2 over MIDDLE FORK FLATHEAD RIV
Built 2002
NFSR over MARION CREEK
Built 2008
Bridge Details
- Structure #
- P00001191+08471
- Year Built
- 1966
- Length
- 33.8 m (110.9 ft)
- Max Span
- 12.2 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,025
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.