S 9TH ST W over DODSON SOUTH CANAL 096

SW MALTA-9TH ST · County 071, Montana · Built 1950 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
M36076000+00101
Year Built
1950
Reconstructed
1980
Length
16.5 m (54.1 ft)
Max Span
5.5 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$61,000
Total Project Cost
$76,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.