COUNTY ROAD 213 over SUN RIVER SLOPE CANAL071
3M S PISHKUN RESERVOIR · County 099, Montana · Built 2016 · 1 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.646425, -112.453614
This bridge is in worse condition than 7.3% of bridges in County 099. The average bridge in Montana is 0 years old; this one is 10 years old.
Nearby Bridges
PISHKUN RD over DEEP CREEK 076
Built 1986
SUN CANYON RD over WILLOW CREEK 160
Built 2015
US 287 over USRS CANAL
Built 2005
DEEP CREEK RD over DEEP CREEK 065
Built 1976
US 287 over SUN RIVER
Built 1936
PISHKUN RD over WILLOW CREEK 070
Built 1970
BARR CREEK RD over N FORK WILLOW CREEK 125
Built 1991
BARR CREEK RD over WILLOW CREEK 026
Built 1991
Bridge Details
- Structure #
- L50049008+08001
- Year Built
- 2016
- Length
- 29.4 m (96.5 ft)
- Max Span
- 29 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.