SILVER BOW RD over SILVER BOW CREEK 014
3M W ROCKER · County 093, Montana · Built 2006 · 2 Lanes · 102 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
46.005069, -112.661861
This bridge is in worse condition than 72.9% of bridges in County 093. The average bridge in Montana is 0 years old; this one is 20 years old.
Nearby Bridges
GERMAN GULCH RD over RR 012
Built 2014
GERMAN GULCH RD over INT VICTOR I 15 003
Built 1961
I 15 over LOCAL-CREEK-RARUS RR
Built 1961
I 15 over LOCAL-CREEK-RARUS RR
Built 1961
I 90 over INT NISSLER
Built 1968
I 90 over INT NISSLER
Built 1968
PALMER ST over INT RAMSEY I 90 013
Built 1967
S ROCKER RD over SILVER BOW CREEK 007
Built 1987
I 90 over SEP LAIRD ST-FRONTAGE RD
Built 1967
I 90 over SEP LAIRD ST-FRONTAGE RD
Built 1967
Bridge Details
- Structure #
- L47001000+02001
- Year Built
- 2006
- Length
- 24.4 m (80.1 ft)
- Max Span
- 24.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 102
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $93,000
- Total Project Cost
- $117,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.