SHIPPE CANYON RD over OTTER CREEK 037

11M S PLENTYWOOD · County 091, Montana · Built 1987 · 2 Lanes · 117 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
L46404010+09001
Year Built
1987
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
117
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.