SHIPPE CANYON RD over BIG MUDDY CREEK 032

2M S PLENTYWOOD · County 091, Montana · Built 1970 · 2 Lanes · 117 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
L46404001+04001
Year Built
1970
Length
18.9 m (62 ft)
Max Span
18.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
117
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.