S REDSTONE RD over WOLF CREEK 040
12M S REDSTONE · County 091, Montana · Built 1950 · 2 Lanes · 64 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
48.6738, -105.005647
This bridge is in worse condition than 66.7% of bridges in County 091. The average bridge in Montana is 0 years old; this one is 76 years old.
Nearby Bridges
Bridge Details
- Structure #
- L46401012+01001
- Year Built
- 1950
- Reconstructed
- 2005
- Length
- 9.1 m (29.9 ft)
- Max Span
- 4.8 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 64
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,000
- Total Project Cost
- $54,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.