BLACK LN over SURPRISE DITCH 056

2M N HAMILTON · County 081, Montana · Built 2013 · 2 Lanes · 1,206 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L41318001+04001
Year Built
2013
Length
9.1 m (29.9 ft)
Max Span
8.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
1,206
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.