WILLOUGHBY LN over SUPPLY DITCH 085
4M S STEVENSVILLE · County 081, Montana · Built 2014 · 2 Lanes · 641 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.445139, -114.071483
This bridge is in worse condition than 18% of bridges in County 081. The average bridge in Montana is 0 years old; this one is 12 years old.
Nearby Bridges
WINTERS LANE over SUPPLY DITCH 065
Built 1994
BELL CROSSING over BITTERROOT RIVER OVERFLO
Built 1974
HOME ACRES RD over SUPPLY DITCH 023
Built 1978
S SUNSET BENCH RD over IRRIGATION CANAL 018
Built 1970
BELL CROSSING over BITTERROOT RIVER OVERFLO
Built 1974
BELL CROSSING over BITTERROOT RIVER OVERFLO
Built 1974
BELL CROSSING over BITTERROOT RIVER
Built 1974
VICTOR CROSSING E over BITTERROOT RIVER 017
Built 1984
US 93 over SWEATHOUSE CREEK
Built 2010
VICTOR CROSSING E over BITTERROOT RIVER 019
Built 1982
Bridge Details
- Structure #
- L41311001+02001
- Year Built
- 2014
- Length
- 14.3 m (46.9 ft)
- Max Span
- 14.3 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 641
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $56,000
- Total Project Cost
- $84,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.