SAWMILL RD over CLARK FORK RIVER 026
GARRISON · County 077, Montana · Built 2006 · 2 Lanes · 78 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.519647, -112.8086
This bridge is in worse condition than 32.7% of bridges in County 077. The average bridge in Montana is 0 years old; this one is 20 years old.
Nearby Bridges
I 90 over INT W GARRISON-RR
Built 1979
I 90 over INT W GARRISISON-RR
Built 1979
SAWMILL RD over ROCK CREEK 047
Built 2006
I 90 over LITTLE BLACKFOOT RIVER
Built 1979
I 90 over LITTLE BLACKFOOT RIVER
Built 1979
I 90 over INT E GARRISON-RR
Built 1979
I 90 over INT E GARRISON-RR
Built 1979
US 12 over LITTLE BLACKFOOT RIVER
Built 1952
I 90 over SEP GARRISON FRONTAGE RD
Built 1973
I 90 over SEP GARRISON FRONTAGE RD
Built 1973
Bridge Details
- Structure #
- L39027000+04001
- Year Built
- 2006
- Length
- 51.3 m (168.3 ft)
- Max Span
- 25.2 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 78
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $118,000
- Total Project Cost
- $148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.