E LAKE RD over PONDERA COULEE 029
15M W CONRAD · County 073, Montana · Built 1960 · 2 Lanes · 77 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.144342, -112.263811
This bridge is in worse condition than 53.1% of bridges in County 073. The average bridge in Montana is 0 years old; this one is 66 years old.
Nearby Bridges
COALMINE RD over DRAINAGE 032
Built 1986
CONRAD DUPUYER RD over DRY FORK MARIAS RIVER
Built 1966
HAWKEYE RD over PONDERA COULEE 047
Built 1950
E LAKE RD over DRY FK MARIAS RIVER 030
Built 1960
CONRAD DUPUYER RD over DRAINAGE
Built 1953
SKYVIEW RD S over DRY FK MARIAS RIVER 069
Built 1987
PENDROY RD over FARMER`S COULEE
Built 1949
SKYVIEW RD S over NO NAME 070
Built 1960
US 89 over S FK DRY FK MARIAS RIVER
Built 2013
E LAKE RD over LONE MAN COULEE
Built 1975
Bridge Details
- Structure #
- L37304003+00001
- Year Built
- 1960
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 77
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.