FRENCHMAN RD over FRENCHMAN RSV SPWY 124
21M N SACO · County 071, Montana · Built 1951 · 1 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.694583, -107.239086
This bridge is in worse condition than 49.5% of bridges in County 071. The average bridge in Montana is 0 years old; this one is 75 years old.
Bridge Details
- Structure #
- L36017015+03001
- Year Built
- 1951
- Reconstructed
- 1985
- Length
- 38.7 m (127 ft)
- Max Span
- 7.6 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.