SAVOY RD over DRAINAGE 112
W DODSON · County 071, Montana · Built 1951 · 2 Lanes · 16 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
48.395322, -108.237539
This bridge is in worse condition than 49.5% of bridges in County 071. The average bridge in Montana is 0 years old; this one is 75 years old.
Nearby Bridges
US 2 over DODSON NORTH CANAL
Built 1976
IRR - US 2 over DRAINAGE
Built 1973
COUNTY ROAD 055 over DODSON NORTH CANAL 013
Built 1986
S 204-STAGE RD over MILK RIVER
Built 1954
US 2 over DODSON CREEK OVERFLOW
Built 2008
IRR - US 2 over MILK RIVER
Built 1972
SAVOY RD over DODSON NORTH CANAL 014
Built 1990
COUNTY ROAD 029 over DODSON NORTH CANAL 037
Built 1990
IRR - US 2 over DODSON SOUTH CANAL
Built 1972
US 2 over SPRING CREEK
Built 2008
Bridge Details
- Structure #
- L36001000+03001
- Year Built
- 1951
- Length
- 23.5 m (77.1 ft)
- Max Span
- 7.6 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 16
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $138,000
- Total Project Cost
- $207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.