SEYLER LN over RUBY RIVER 019

7M NW SHERIDAN · County 057, Montana · Built 1976 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
L29144011+00001
Year Built
1976
Length
18.6 m (61 ft)
Max Span
10.1 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$88,000
Total Project Cost
$132,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.