CHERRY CREEK RD over CHERRY CREEK 052

9M NE NORRIS · County 057, Montana · Built 2009 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

45.616383, -111.541678

This bridge is in worse condition than 7.1% of bridges in County 057. The average bridge in Montana is 0 years old; this one is 17 years old.

Nearby Bridges

Bridge Details

Structure #
L29082000+05001
Year Built
2009
Length
18.6 m (61 ft)
Max Span
18.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$93,000
Total Project Cost
$140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.