BOTHMAN DR over PIPE CREEK 121

4M NW LIBBY · County 053, Montana · Built 2010 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
L27340000+06001
Year Built
2010
Length
27 m (88.6 ft)
Max Span
26.2 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$120,000
Total Project Cost
$180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.