BROADHURST RD over PONDERA COULEE 013
4M S TIBER DAM · County 051, Montana · Built 1977 · 1 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.270514, -111.145564
This bridge is in worse condition than 50% of bridges in County 051. The average bridge in Montana is 0 years old; this one is 49 years old.
Bridge Details
- Structure #
- L26040001+05001
- Year Built
- 1977
- Length
- 11.6 m (38.1 ft)
- Max Span
- 11 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.