ROAD 160 NORTH over MILK RIVER 037
30M NW HAVRE · County 041, Montana · Built 1938 · 1 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
48.798208, -110.133047
This bridge is in worse condition than 76.1% of bridges in County 041. The average bridge in Montana is 0 years old; this one is 88 years old.
Bridge Details
- Structure #
- L21006005+09001
- Year Built
- 1938
- Length
- 87.1 m (285.8 ft)
- Max Span
- 36.6 m
- Width
- 5.4 m (17.7 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $427,000
- Total Project Cost
- $641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.