FRONTAGE ROAD 153 over CLARK FORK RIVER 034

14M W DRUMMOND · County 039, Montana · Built 1970 · 2 Lanes · 272 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L20153000+01001
Year Built
1970
Length
51.8 m (169.9 ft)
Max Span
17.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
272
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.