FRONTAGE ROAD 153 over CLARK FORK RIVER 034
14M W DRUMMOND · County 039, Montana · Built 1970 · 2 Lanes · 272 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.700108, -113.431192
This bridge is in worse condition than 64.4% of bridges in County 039. The average bridge in Montana is 0 years old; this one is 56 years old.
Nearby Bridges
I 90 over INT BEARMOUTH
Built 1970
I 90 over INT BEARMOUTH
Built 1970
I 90 over CLARK FORK RIVER
Built 1970
I 90 over HARVEY CREEK
Built 1970
I 90 over DRAINAGE
Built 1971
I 90 over ANTELOPE CREEK
Built 1971
BEAR GULCH RD over CLARK FORK RIVER 002
Built 1986
I 90 over SEP BEARMOUTH ROAD
Built 1970
GILLESPIE SLIDEROC over CLARK FORK
Built 1965
I 90 over INT BEAVERTAIL
Built 1972
Bridge Details
- Structure #
- L20153000+01001
- Year Built
- 1970
- Length
- 51.8 m (169.9 ft)
- Max Span
- 17.4 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 272
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.