UPPER ROCK CR RD over STONY CREEK 011

19M W PHILLIPSBURG · County 039, Montana · Built 1999 · 2 Lanes · 603 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

46.348669, -113.605578

This bridge is in worse condition than 38.4% of bridges in County 039. The average bridge in Montana is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
L20002013+00001
Year Built
1999
Length
15.3 m (50.2 ft)
Max Span
14.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
603
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.