SULLIVAN BRIDGE RD over MARIAS RIVER 030
14M SE CUTBANK · County 035, Montana · Built 1968 · 1 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.486711, -112.226011
This bridge is in worse condition than 77.5% of bridges in County 035. The average bridge in Montana is 0 years old; this one is 58 years old.
Bridge Details
- Structure #
- L18010002+05001
- Year Built
- 1968
- Length
- 86.3 m (283.1 ft)
- Max Span
- 21.3 m
- Width
- 4.5 m (14.8 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.