STAGECOACH TRL RD over BAKER CREEK 082
2M NW BELGRADE · County 031, Montana · Built 1959 · 1 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
45.787169, -111.273492
This bridge is in worse condition than 95.3% of bridges in County 031. The average bridge in Montana is 0 years old; this one is 67 years old.
Nearby Bridges
STAGECOACH TRL RD over BAKER CREEK OVERFLOW 081
Built 1965
HEEB RD over BAKER CREEK 080
Built 1992
AMSTERDAM RD over BAKER CREEK
Built 1952
AMSTERDAM RD over GALLATIN RIVER
Built 1951
I 90 over SEP THORPE ROAD
Built 1965
I 90 over SEP THORPE ROAD
Built 1965
CHURCHILL RD S 288 over CAMP CREEK
Built 2024
I 90 over GALLATIN RIVER
Built 1965
I 90 over GALLATIN RIVER
Built 1965
FRONTAGE RD-S 205 over GALLATIN RIVER
Built 1949
Bridge Details
- Structure #
- L16447001+09001
- Year Built
- 1959
- Length
- 10.7 m (35.1 ft)
- Max Span
- 5.7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.