STORY HILL RD over ROCKY CREEK
2M E BOZEMAN · County 031, Montana · Built 2005 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.672281, -110.980717
This bridge is in worse condition than 23.1% of bridges in County 031. The average bridge in Montana is 0 years old; this one is 21 years old.
Nearby Bridges
I 90 over SEP FORT ELLIS ROAD
Built 1971
I 90 over SEP FORT ELLIS ROAD
Built 1971
KELLY CANYON RD over ROCKY CREEK 042
Built 2001
I 90 over INT E BOZEMAN-P 50
Built 1971
I 90 over INT E BOZEMAN-P 50
Built 1971
I 90 over RR
Built 1971
I 90 over RR
Built 1971
BOZEMAN TRAIL RD over BEAR CREEK
Built 2019
I 90 over INT BEAR CANYON
Built 1962
I 90 over INT BEAR CANYON
Built 1962
Bridge Details
- Structure #
- L16008000+02001
- Year Built
- 2005
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7.3 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $22,000
- Total Project Cost
- $28,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.