BLANKENSHIP RD over FLATHEAD RIVER 070
4M NW CORAM · County 029, Montana · Built 1960 · 2 Lanes · 548 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
48.465333, -114.071067
This bridge is in worse condition than 71.6% of bridges in County 029. The average bridge in Montana is 0 years old; this one is 66 years old.
Nearby Bridges
GLACIER INSTITUTE over MCDONALD CREEK
Built 2000
S 65 over MIDDLE FK FLATHEAD RIVER
Built 1966
CEDAR CREEK ROAD over CEDAR CREEK
Built 1992
OLD US 2 E over ABBOT CREEK 063
Built 1931
CAMAS ROAD over MCDONALD CREEK
Built 1962
IRR - US 2 over S FORK FLATHEAD RIVER
Built 2018
CANYON CREEK RD over CANYON CREEK
Built 1976
CANYON CR ROAD over CANYON CREEK
Built 1977
N FORK RD over RR
Built 1972
FISH CREEK CAMPGRO over FISH CREEK
Built 1963
Bridge Details
- Structure #
- L15427002+03001
- Year Built
- 1960
- Reconstructed
- 1991
- Length
- 118.8 m (389.8 ft)
- Max Span
- 29 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 548
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $505,000
- Total Project Cost
- $758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.