FRONTAGE ROAD 011 over LOST CREEK 037
3M N WARM SPRINGS · County 023, Montana · Built 1931 · 2 Lanes · 916 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
46.218531, -112.773525
This bridge is in worse condition than 79.1% of bridges in County 023. The average bridge in Montana is 0 years old; this one is 95 years old.
Nearby Bridges
I 90 over LOST CREEK
Built 1978
I 90 over SEP HUFFMAN LANE
Built 1978
I 90 over SEP PERKINS LANE
Built 1978
COUNTY ROAD 098 over CLARK FORK RIVER 020
Built 1920
I 90 over INT GALEN
Built 1978
I 90 over INT GALEN
Built 1978
GALEN RD E over CLARK FORK RIVER 038
Built 1973
FRONTAGE ROAD 137 over WARM SPRINGS CREEK 039
Built 1974
GAS CITY RD over CLARK FORK RIVER 019
Built 2011
I 90 over INT WARM SPRINGS
Built 1978
Bridge Details
- Structure #
- L12148003+04001
- Year Built
- 1931
- Reconstructed
- 1946
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 916
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.