FRONTAGE ROAD 146 over DRAINAGE 032
3M S WARM SPRINGS · County 023, Montana · Built 1931 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.142667, -112.795244
This bridge is in worse condition than 1.5% of bridges in County 023. The average bridge in Montana is 0 years old; this one is 95 years old.
Nearby Bridges
FRONTAGE ROAD 146 over DRAINAGE 025
Built 1931
FRONTAGE ROAD 146 over CLARK FORK RIVER 034
Built 1931
I 90 over CLARK FORK RIVER
Built 1978
I 90 over CLARK FORK RIVER
Built 1978
I 90 over WILLOW CREEK
Built 1978
FRONTAGE ROAD 146 over WILLOW CREEK 033
Built 1931
STEWART ST over SEP I 90 003
Built 1964
S 48 over WARM SPRINGS CREEK
Built 1931
STEWART ST over SILVERBOW CREEK 012
Built 1969
S 1 over RR
Built 1964
Bridge Details
- Structure #
- L12146001+09001
- Year Built
- 1931
- Reconstructed
- 1940
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.