STUMPTOWN RD over WARM SPRINGS CREEK 006

4M NW ANACONDA · County 023, Montana · Built 2015 · 2 Lanes · 142 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
L12005000+03001
Year Built
2015
Length
15.8 m (51.8 ft)
Max Span
15.2 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
142
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$112,000
Total Project Cost
$168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.