BRIDGER FROMBERG R over BLUEWATER CREEK 001

2M SE FROMBERG · County 009, Montana · Built 1913 · 2 Lanes · 175 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L05302008+06001
Year Built
1913
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
5.3 m (17.4 ft)
Lanes
2
Daily Traffic
175
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$31,000
Total Project Cost
$47,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.