8 MILE RD over MILK RIVER 078

5M SE ZURICH · County 005, Montana · Built 1930 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L03305012+08001
Year Built
1930
Reconstructed
1940
Length
74.8 m (245.4 ft)
Max Span
36.6 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$681,000
Total Project Cost
$1,022,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.