UPPER RD over TWO LEGGIN`S CANAL 005
8M NW HARDIN · County 003, Montana · Built 1950 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.833083, -107.632556
This bridge is in worse condition than 86.5% of bridges in County 003. The average bridge in Montana is 0 years old; this one is 76 years old.
Nearby Bridges
S 47 over LOW LINE DITCH
Built 1989
PINE RIDGE RD over TWO LEGGIN`S CANAL 014
Built 1993
W BOEHS RD over TWO LEGGIN`S CANAL 049
Built 1996
IRR-S 47 over INT W HARDIN I 90
Built 1970
IRR - I 90 over RR (NOT IN USE)
Built 1971
IRR - I 90 over RR (NOT IN USE)
Built 1971
N TORSKE OVERPASS over SEP I 90 00
Built 1971
VANZANDT RD over TWO LEGGIN`S CANAL 047
Built 1994
IRR-S 47-3RD ST E over INT E HARDIN I 90
Built 1971
OLD HWY 87 over TWO LEGGINS CANAL 0
Built 1931
Bridge Details
- Structure #
- L02011003+05001
- Year Built
- 1950
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.1 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $42,000
- Total Project Cost
- $46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.