TULLOCK CR RD over TULLOCK CREEK 029
15M NE HARDIN · County 003, Montana · Built 2006 · 2 Lanes · 34 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
45.873464, -107.327064
This bridge is in worse condition than 36.1% of bridges in County 003. The average bridge in Montana is 0 years old; this one is 20 years old.
Bridge Details
- Structure #
- L02002006+05001
- Year Built
- 2006
- Length
- 20.1 m (65.9 ft)
- Max Span
- 20.1 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 34
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $50,000
- Total Project Cost
- $62,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.