FRYING PAN RD over SEP I 15 126

3M N DILLON · County 001, Montana · Built 1973 · 2 Lanes · 357 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
L01112000+05201
Year Built
1973
Length
94.8 m (311 ft)
Max Span
30.5 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
357
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.