I 94 over SEP RR
18.6M E BIGHORN · County 103, Montana · Built 1973 · 4 Lanes · 5,042 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
46.263372, -107.149561
This bridge is in worse condition than 7.7% of bridges in County 103. The average bridge in Montana is 0 years old; this one is 53 years old.
Nearby Bridges
I 94 over SARPY CREEK
Built 1967
I 94 over SARPY CREEK
Built 1976
SARPY CREEK RD over INT SARPY CREEK I 94
Built 1967
SARPY CREEK RD over SARPY CREEK
Built 1990
FRONTAGE ROAD 018 over DRAINAGE 010
Built 1933
FRONTAGE RD over SARPY CREEK 003
Built 1925
FRONTAGE ROAD 018 over DRAINAGE 009
Built 1933
OLD HWY 10 over SARPY CREEK 014
Built 2015
OLD HWY 10 over DRAINAGE 015
Built 1933
I 94 over INT HYSHAM
Built 1964
Bridge Details
- Structure #
- I00094071+04801
- Year Built
- 1973
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 85.3 m (279.9 ft)
- Lanes
- 4
- Daily Traffic
- 5,042
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $176,000
- Total Project Cost
- $194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.