I 94 over SPRING CREEK ROAD

11.2M E POMPEYS PILLAR · County 111, Montana · Built 1973 · 2 Lanes · 2,255 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
I00094034+02452
Year Built
1973
Length
18.6 m (61 ft)
Max Span
7 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
2,255
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.