I 94 over SIAN HILL ROAD

6.2M E POMPEYS PILLAR · County 111, Montana · Built 1976 · 2 Lanes · 2,255 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

46.013636, -107.874269

This bridge is in worse condition than 35.2% of bridges in County 111. The average bridge in Montana is 0 years old; this one is 50 years old.

Nearby Bridges

Bridge Details

Structure #
I00094029+02431
Year Built
1976
Length
24.1 m (79.1 ft)
Max Span
9.1 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
2,255
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.