I 90 over IRRIGATION CANAL

3.1M S HARDIN · County 003, Montana · Built 1971 · 6 Lanes · 8,516 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
I00090498+04621
Year Built
1971
Length
7.7 m (25.3 ft)
Max Span
3.3 m
Lanes
6
Daily Traffic
8,516
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$278,000
Total Project Cost
$417,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.