I 90 over CANYON CREEK

3.1M W BILLINGS · County 111, Montana · Built 1959 · 2 Lanes · 12,397 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
I00090442+08261
Year Built
1959
Reconstructed
1999
Length
46.6 m (152.9 ft)
Max Span
15.8 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
12,397
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$334,000
Total Project Cost
$367,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.