I 90 over INT LAUREL-P 4-RR
LAUREL · County 111, Montana · Built 1964 · 2 Lanes · 9,599 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.662564, -108.769342
This bridge is in worse condition than 35.2% of bridges in County 111. The average bridge in Montana is 0 years old; this one is 62 years old.
Nearby Bridges
I 90 over INT LAUREL-P 4-RR
Built 1964
S 8TH AVE over SEP I 90 010
Built 1967
US 212 over YELLOWSTONE RIVER
Built 1997
BERNHARDT RD over DRAINAGE DITCH 191
Built 1980
I 90 over INT W LAUREL-RR
Built 2019
I 90 over INT W LAUREL-RR
Built 2018
STRAUCH RD over BBWA CANAL 063
Built 2014
19TH AVE W over I-90
Built 2020
1ST AVE over BIG DITCH
Built 1968
VALLEY DR over BIG DITCH 111
Built 2008
Bridge Details
- Structure #
- I00090434+00901
- Year Built
- 1964
- Reconstructed
- 2007
- Length
- 111.5 m (365.8 ft)
- Max Span
- 34.1 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 9,599
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $692,000
- Total Project Cost
- $761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.