I 90 over KEYSER CREEK

1.2M W COLUMBUS · County 095, Montana · Built 1971 · 2 Lanes · 5,861 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
I00090407+08621
Year Built
1971
Reconstructed
2014
Length
58.2 m (190.9 ft)
Max Span
23.3 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
5,861
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.