I 90 over RR

6.2M E REED POINT · County 095, Montana · Built 1962 · 2 Lanes · 5,423 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

45.685933, -109.425903

This bridge is in worse condition than 76.1% of bridges in County 095. The average bridge in Montana is 0 years old; this one is 64 years old.

Nearby Bridges

Bridge Details

Structure #
I00090398+04601
Year Built
1962
Length
75.9 m (249 ft)
Max Span
20.1 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
5,423
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$704,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.