I 90 over SEP HUMP CREEK ROAD

1.2M W REED POINT · County 097, Montana · Built 1963 · 2 Lanes · 5,423 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
I00090391+00401
Year Built
1963
Length
31.1 m (102 ft)
Max Span
11 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,423
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.