I 90 over UPPER DEER CREEK

2.5M W GREYCLIFF · County 097, Montana · Built 1980 · 2 Lanes · 6,153 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
I00090375+04861
Year Built
1980
Length
52.4 m (171.9 ft)
Max Span
26.2 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
6,153
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.