I 90 over RR

4.3M E BOZEMAN · County 031, Montana · Built 2006 · 2 Lanes · 9,819 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
I00090314+00832
Year Built
2006
Length
130 m (426.5 ft)
Max Span
55 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
9,819
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$628,000
Total Project Cost
$691,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.